POSIDON Kick-off meeting Phase 2

We have had the kick-off meeting of the phase 2 of the POSIDON Project a Polluted Site Decontamination PCP (https://www.posidonproject.eu).

The common challenge faced by the POSIDON buyers’ group is identifying a soil (and eventually groundwater) remediation new, life-cycle, cost-effective technology, preferred as in-situ (and eventually on-site), to be capable of decontaminate heterogeneous anthropic soils in brownfield, composed by a mixture of industrial waste (like filling soils highly polluted by Petroleum Hydrocarbons) and soils consisting on clays and sands, highly polluted by Petroleum hydrocarbons (TPHs and PAHs), and heavy metals.

After being qualified for the phase 1, the #Eurecat- #Amphos 21 team qualified for the prototyping phase which started today.

  • Post category:News